Before: two garage units, a bathroom, and a very long bedroom area.

After: one garage unit, the same bathroom, a bunk-room (cave), a nice-sized bedroom, and a play-room.

Right garage door blocked-in (open space for two large windows). Salvador,
the mason, spent the full day laying that masonry, which is completely filled with mortar.

Job-site conference between George and Serio
(the plumber, drywall guy, carpenter, etc.)

Doorway into bedroom (on the right), and pocket-door opening into bunk-room,
on the left. Still waiting for HVAC guy to move those flex-ducts!

Salvador cleaning up, after a long day slinging block and mortar. This is the