Tile installation

Russ sawing tile outside.

Working his way back into the bunkroom; the skipped tiles
are his walkway, to be filled in tomorrow.

The pocket door into the bunkroom hasn't yet been erected,
but he has left bare concrete for that to be put in later (where the level is resting).

The garage entry ramp has been leveled, and tile won't be set until
tomorrow, when the leveling compound has cured.